|
All water projects are handled on a project specific basis.
The Contractor shall furnish all labor, materials, equipment, machinery, apparatus and tools and perform all operations necessary to install, equip, adjust and to put into satisfactory operation the work of the project, and shall so connect the various items or sections of the work of the project so as to form a complete and operating whole. Any labor, materials, equipment or apparatus not specifically mentioned herein, or shown on the Detail Drawings, which may be found necessary to complete or perfect any portion of the work in a substantial manner and in compliance with the requirements stated or implied by these Specifications and Standard Details; shall be provided by the Contract.
|